Disclaimer
This tool provides a preliminary cost estimate for remediation projects based on user inputs and standard regional rates. It is intended for informational purposes only and does not constitute a formal quote or contract.
Limitations
The estimate:
- Excludes costs related to:
- Groundwater influx
- Bedrock excavation
- Mobilization/demobilization
- Third-party services, unless explicitly stated
- Assumes standard site conditions and does not account for unique project complexities or regulatory requirements.
- Relies on user-provided data, including location references (e.g., nearest town or Google Maps pin), which may affect accuracy.
Accuracy
While we strive to provide reliable estimates, actual project costs may vary significantly from the estimates provided. Factors such as site-specific and access conditions, environmental assessments, seasonality, weather, and engineering requirements can impact final pricing.
User Responsibility
Users are responsible for:
- Ensuring all mandatory fields (marked with *) are completed accurately.
- Reviewing the “i” icons for guidance on excavation volume and other entries.
- Recognizing that alternative landfills could be used to match specific contaminants.
Assumptions & Clarifications:
- Pricing is for budget estimate purposes only.
- Pricing based on standard production for equipment.
- Pricing for landfill disposal is based on generic rates provided by designated landfill and are subject to change.
- Pricing is based on direct excavate and load for offsite transport/disposal.
- Sublatus has assumed that sites are accessible by standard highway tractor/trailer units.
- Sublatus has assumed no road bans (trucking based on full legal loads).